Y CombinatorY Combinator Backed

About Helonic

We're building AI to eliminate the $31 billion lost annually to construction rework (CII). Founded by construction and software veterans who've lived the pain firsthand.

$31B
Annual rework cost in US construction
$1,080
Average cost per RFI to process
10-15
Days average RFI takes to resolve
10x
Cost multiplier when issues found in field

Our Story

Helonic started from real frustration on real jobsites. Our founding team spent years in the construction industry—managing projects, coordinating trades, and dealing with the consequences when drawings didn't match reality. We watched millions of dollars burn on rework that could have been prevented with better plan review.

The problem wasn't that people didn't care. It was that manually reviewing hundreds of drawings across multiple disciplines, checking for coordination conflicts, code compliance, and missing information—it's simply too much for any team to catch everything. Important issues slip through, and by the time they're discovered in the field, fixing them costs 10x more.

We combined our construction experience with deep software engineering expertise to build what we wished we'd had: AI that reads drawings like an experienced project manager, catches the issues that humans miss, and does it in minutes instead of days.

Team Background

Construction Background

  • • Years of experience in commercial construction project management
  • • Managed projects ranging from $5M to $100M+
  • • Hands-on experience with preconstruction, coordination, and field operations
  • • Deep understanding of the RFI process, change orders, and rework costs
  • • Worked across multifamily, commercial, healthcare, and institutional projects

Software & AI Background

  • • Engineering experience at top technology companies
  • • Expertise in machine learning, computer vision, and document analysis
  • • Built and scaled production AI systems processing millions of documents
  • • Deep experience with PDF parsing, OCR, and spatial analysis
  • • Track record of shipping products used by thousands of customers

Y Combinator Backed

Y Combinator

Helonic is proud to be part of Y Combinator, the world's most prestigious startup accelerator. Y Combinator has backed companies like Airbnb, Stripe, DoorDash, Coinbase, and over 4,000 other startups with a combined valuation of over $600 billion.

Being a YC company means we're held to the highest standards of execution, product quality, and customer focus. We're building a company designed to transform how the construction industry approaches plan review and coordination.

View our Y Combinator profile →

Our Mission

Eliminate costly construction rework by catching issues before they reach the field.

The construction industry is one of the least digitized sectors of the economy, yet it represents 13% of global GDP (McKinsey Global Institute). Every year, the US construction industry loses $31 billion to rework (CII)—mistakes that could have been caught during plan review but weren't because manual review simply can't scale.

We believe AI can fundamentally change this equation. Not by replacing experienced professionals, but by giving them superpowers: the ability to review drawings faster, catch more issues, and focus their expertise where it matters most.

Our goal is to make AI-powered drawing analysis the standard in construction—as essential as Procore for project management or Bluebeam for PDF markup. Every project, every drawing set, every team should have access to this technology.

Why We're Different

Built by Builders

We've lived the pain of rework and RFIs. We're not outsiders guessing what construction needs—we've been in the field and the trailer.

Works with 2D PDFs

Unlike BIM clash detection that requires 3D models, Helonic works with the drawings you already have. No model, no problem.

Integrates with Your Workflow

Native Procore and Autodesk integration. Push issues as RFIs with one click. Helonic fits into how you already work.

The Problem We Solve

Industry Statistics

  • $31 billion lost annually to construction rework in the US (CII)
  • 5-10% of total construction costs go to rework (FMI)
  • 52% of rework is caused by project data and communication issues (PlanGrid)
  • $1,080 average cost to process a single RFI (Navigant)
  • 800+ RFIs on average for a $50M project

What This Means

  • A $50M project can lose $2.5-5M to preventable rework
  • RFI costs alone can exceed $800,000 per major project
  • Issues found in preconstruction cost 10x less to fix than in the field
  • Manual review catches only 60-70% of issues; AI can push this to 90%+
  • Every hour spent in preconstruction review saves 5+ hours in the field

Get in Touch

We'd love to hear from you. Whether you're interested in using Helonic for your projects, exploring partnership opportunities, or just want to learn more about what we're building, reach out.

Sources & References

  • Construction Industry Institute (CII)Rework: Costs and Causes in Construction, Research Summary 153-1. Source for $31B annual rework cost, 5-9% rework rate, $8,300 average rework event cost, and the 1-10-100 cost escalation rule.
  • FMI CorporationU.S. Construction Industry Analysis. Source for 5-10% total construction cost rework estimates.
  • • Navigant Construction Forum — RFI Cost Analysis. Source for $1,080 average RFI processing cost and 9.7-day average response time.
  • PlanGrid / AutodeskConstruction Disconnected Report, 2018. Source for 52% of rework caused by data and communication issues.
  • McKinsey Global InstituteReinventing Construction: A Route to Higher Productivity, 2017. Source for construction productivity and automation data.
  • Associated Builders and Contractors (ABC)Workforce Shortage Analysis, 2024. Source for 501,000 construction worker shortage figure.