Symbol Reference

Site & Civil Symbols Guide

Reference for utilities, drainage, grading, and site features on civil engineering drawings

APWA Uniform Color Code
🔴 Red - Electric
🟡 Yellow - Gas/Oil
🟠 Orange - Telecom
🔵 Blue - Water
🟢 Green - Sewer
🟣 Purple - Reclaimed
⚪ White - Proposed
⬛ Pink - Survey

Utilities - Underground

SymbolMeaningNotes
——W——Water LineOften blue, shows pipe size
——SS——Sanitary SewerGravity flow, shows slope
——SD——Storm DrainStormwater collection
——G——Gas LineOften yellow
——E——Electric (Underground)Power conduit
——T——Telephone/DataCommunications conduit
——FO——Fiber OpticData communications

Utilities - Overhead

SymbolMeaningNotes
——OH——Overhead ElectricPower lines on poles
——OHT——Overhead TelephoneCommunications on poles
○——○Power PolesWith span between

Drainage Structures

SymbolMeaningNotes
ManholeAccess to underground utilities
Catch BasinSurface water inlet
CleanoutPipe access point
Inlet/OutletPipe termination
□DDrop InletDeep catch basin
HeadwallPipe end structure

Site Features

SymbolMeaningNotes
Existing TreeTo remain or remove
Proposed TreeNew planting
Tree to be RemovedMarked for removal
Light PoleSite lighting
SignTraffic or wayfinding
Fire HydrantEmergency water supply
Transformer PadElectrical equipment

Survey & Grading

SymbolMeaningNotes
Property CornerSurvey monument
BMBenchmarkElevation reference point
Spot ElevationSpecific elevation callout
Contour LineEqual elevation line
━━Existing ContourCurrent grade (often dashed)
──Proposed ContourNew grade (often solid)

Pavement & Hardscape

SymbolMeaningNotes
┃┃┃Curb & GutterEdge of pavement
Concrete PavementHatched area
Asphalt PavementDifferent hatch pattern
┼┼Expansion JointConcrete joint
═══Handicap RampADA accessible route

Common Civil Abbreviations

BM
Benchmark
EL
Elevation
INV
Invert
FL
Flow Line
TC
Top of Curb
TW
Top of Wall
BW
Bottom of Wall
FF
Finish Floor
ROW
Right of Way
PL
Property Line
CL
Centerline
STA
Station
MH
Manhole
CB
Catch Basin
RCP
Reinforced Concrete Pipe
PVC
Polyvinyl Chloride

Related Articles

Coordinate Site with Building

Utility connections shown on civil drawings must align with building MEP plans. Helonic checks that pipe sizes, invert elevations, and connection points coordinate between site and building drawings.

Try Automated Coordination