Code Compliance

Automated Verification

Check construction drawings against IBC, ADA, fire codes, and egress requirements automatically. Catch code violations before plan check.

Why Code Compliance Matters

15-20%
of plan review corrections are code issues
ICC
$75K
average ADA lawsuit settlement
DOJ
3-6 mo
average permit delay from code issues
Industry
30%
of RFIs relate to code clarifications
Navigant

Codes We Check

ADA Accessibility

  • Door clearances and maneuvering space
  • Ramp slopes and handrail requirements
  • Restroom fixture clearances
  • Accessible route continuity
  • Signage and wayfinding

Fire & Life Safety

  • Fire-rated wall and door requirements
  • Fire barrier continuity
  • Smoke barrier requirements
  • Fire sprinkler coverage
  • Fire alarm device placement

Egress

  • Occupant load calculations
  • Exit width requirements
  • Travel distance limits
  • Common path of egress travel
  • Exit sign and lighting placement

IBC General

  • Occupancy classification consistency
  • Construction type requirements
  • Height and area limitations
  • Plumbing fixture counts
  • Ventilation requirements

How It Works

Our AI reads your construction drawings and extracts relevant information:

  • Room names and occupancy types from floor plans
  • Door sizes, swings, and hardware from plans and schedules
  • Wall types and fire ratings from partition schedules
  • Dimensions and clearances from details and plans
  • Fixture counts and locations from plumbing plans

This information is then checked against code requirements. When something does not meet code, you get a specific finding with the code reference and the sheet where the issue appears.

Benefits

Fewer Plan Check Comments

Catch violations before submitting, reducing revision cycles

Reduced Liability

Document that code compliance was verified during design

Faster Reviews

AI handles tedious code cross-referencing automatically

Related Resources

Check Your Drawings for Code Compliance

See what code issues Helonic catches before plan check.

Schedule a Demo