Features
AI-powered analysis tools for construction drawing review.
Clash Detection
Find coordination conflicts across disciplines automatically from 2D PDF drawings. No BIM required.
Code Compliance
Check drawings against IBC, ADA, fire codes, and egress requirements automatically.
RFI Generation
Turn detected issues into formatted RFIs with one click. Export or push to Procore.
Specification Analysis
Cross-reference drawings against specifications to catch material and requirement mismatches.
Revision Comparison
Compare drawing sets to identify changes between revisions, including unclouded modifications.
Schedule Verification
Verify door, window, and finish schedules match what is shown on floor plans.
Document Version Comparison
Compare drawing revisions side-by-side and auto-detect changes between versions.
Dimensional Verification
Automatically verify dimensions add up and match across sheets and details.
Fire & Life Safety Analysis
Check drawings for fire rating, egress, and life safety code compliance.
ADA Accessibility Checking
Verify ADA/ABA compliance in construction drawings automatically.
Sheet Index Validation
Verify sheet index matches actual drawing set. Catch missing or mislabeled sheets.
Annotation & Callout Detection
Find broken references, missing callouts, and orphaned annotations across sheets.
Drawing Set Completeness
Verify your drawing set is complete with all required sheets and information.
AI Submittal Review
Compare submittals against contract documents automatically for faster approvals.
Procore Integration
Push detected issues directly to Procore as RFIs, observations, or punch items.
Purpose-Built Construction AI
Our proprietary model — trained on construction drawings — delivers comprehensive issue coverage.
MEP Penetration Analysis
Detect unauthorized or conflicting MEP penetrations through structural elements.
Egress Path Compliance
Verify egress paths meet IBC requirements for travel distance, width, and dead ends.
Above-Ceiling Coordination
Coordinate MEP systems, lighting, and structural elements in the ceiling plenum.
Foundation Plan Review
Analyze foundation plans for coordination issues with utilities and structural elements.
Parking & ADA Compliance
Verify parking layouts meet ADA requirements and local zoning codes.
Building Envelope Analysis
Check building envelope details for continuity, thermal bridging, and waterproofing.
Vertical Alignment & Stacking
Verify vertical alignment of plumbing risers, shafts, columns, and walls across floors.
Detail Cross-Referencing
Verify all detail callouts reference existing details and vice versa.
Keynote & Legend Verification
Validate keynotes match legends and specifications across the drawing set.
Autodesk Construction Cloud
Sync projects and drawings directly from Autodesk Construction Cloud.
See All Features in Action
Book a demo and we will walk you through how each feature works on your actual drawings.
Schedule a Demo