RFI Generation
One-Click Export
Turn detected issues into formatted RFIs with one click. Export as documents or push directly to Procore.
Why RFI Efficiency Matters
How It Works
- 1
Review Findings
Helonic identifies issues and presents them in a prioritized list with sheet references.
- 2
Select Issues
Choose which findings you want to convert to RFIs. Dismiss false positives or items you will handle differently.
- 3
Generate RFIs
Click to generate formatted RFIs with all required fields: subject, description, sheet reference, and suggested response.
- 4
Export or Push
Download as PDF/Excel or push directly to your Procore project as draft RFIs.
RFI Fields Generated
- Subject Line: Clear, specific subject that identifies the issue
- Description: Detailed explanation of the conflict or missing information
- Sheet Reference: Specific sheet number(s) where the issue appears
- Location: Grid lines, room numbers, or other location identifiers
- Suggested Response: Proposed resolution to guide the design team
- Priority: Severity rating based on impact to construction
- Category: Issue type (coordination, code, specification, etc.)
Procore Integration
Connect your Procore account and push RFIs directly to your project:
- RFIs created as drafts in Procore for your review
- Sheet references linked to Procore drawings when available
- Assignees and due dates can be set before pushing
- RFI numbers follow your Procore numbering convention
Export Options
Formatted RFI documents ready for submission
Excel
Spreadsheet format for tracking and analysis
Procore
Direct push to your Procore project
Related Resources
Streamline Your RFI Workflow
See how Helonic generates RFIs from detected issues automatically.
Schedule a Demo