AI Drawing Review for General Contractors
Catch coordination issues before they become change orders. Protect your margins on every project.
The GC's Challenge
Drawing Errors
Design team conflicts become your field problems
Margin Erosion
Change orders eat into already thin margins
Review Bottleneck
Not enough senior staff to review every set
How Helonic Helps
Pre-Bid Document Review
Before you price a job, know what coordination issues exist. Factor risk into your bid or call them out during the bid process.
Shop Drawing Review
When subs submit shop drawings, verify they match the contract documents and don't conflict with other trades.
CD Set Review at Milestones
Review documents at 50%, 90%, and IFC to catch issues before construction starts.
RFI Generation
Turn detected issues into RFIs with one click. Export to Procore or generate standalone documents.
Subcontractor Coordination
Find conflicts between MEP, structural, and architectural before your trades show up and point fingers.
Common Issues We Catch for GCs
Coordination Conflicts
- MEP routing through structural members
- Ceiling height vs above-ceiling MEP
- Door swings into fixtures or equipment
- Conflicting dimensions between sheets
Specification Mismatches
- Drawing shows material A, spec says B
- Schedule dimensions vs plan dimensions
- Fire rating requirements vs specified doors
- Missing finish specifications
ROI for General Contractors
Related Resources
See What Helonic Catches on Your Projects
Upload a real drawing set and see what issues our AI identifies before they hit the field.