Procore Integration

Seamless Project Management Sync

Push AI-detected drawing issues directly to Procore as RFIs, observations, or punch items. Connect your Procore projects, sync drawings, and keep your entire team aligned — with zero copy-paste between platforms.

Why Procore Integration Matters

1-Click
RFI creation — detected issues become Procore RFIs instantly
0
copy-paste needed — issues flow directly into your Procore project
Direct
project sync — pull drawings from Procore for analysis
Real-Time
status updates — track issue resolution across both platforms

How It Works

  1. 1

    Connect Procore

    Authenticate your Procore account with a single OAuth click. Helonic connects securely to your Procore organization and lists your active projects.

  2. 2

    Select Project

    Choose the Procore project to sync with. Helonic can pull drawings directly from your Procore documents for analysis, or you can upload separately.

  3. 3

    Run Analysis

    Helonic analyzes your drawings using our proprietary construction-trained AI. Detected issues are categorized by discipline, severity, and type — ready for action.

  4. 4

    Push Issues

    With one click, push any detected issue to Procore as an RFI, observation, or punch item — complete with drawing references, descriptions, and suggested assignees.

Key Capabilities

  • RFI auto-generation — converts detected drawing issues into properly formatted Procore RFIs with subject, question, drawing references, and responsible contractor fields
  • Observation creation — pushes field-relevant issues as Procore observations with type classification, location data, and priority levels
  • Drawing reference linking — attaches the specific drawing sheet and location to every Procore item so the recipient knows exactly where to look
  • Assignee mapping — maps Procore project directory contacts to issue types so RFIs are automatically routed to the right trade or consultant
  • Status synchronization — tracks resolution status across both platforms so your Helonic dashboard reflects Procore updates and vice versa

Why This Matters

Finding issues in drawings is only half the battle — the other half is getting those issues into the hands of the people who can resolve them. Without integration, teams discover issues in one tool and then manually re-enter them into their project management platform. This creates friction, delays action, and introduces transcription errors.

Helonic's Procore integration eliminates this gap entirely. Every issue detected during drawing analysis can be pushed to Procore with a single click — fully formatted with drawing references, descriptions, and routing information. Your team works in Procore as they always have, but now the issues are already there waiting for them.