AI Drawing Review for Architects
QA/QC your documents before they leave the office. Reduce RFIs and protect your reputation.
The Architect's Challenge
RFI Volume
Every RFI reflects on your documents and takes time to answer
Liability Exposure
Errors and omissions create professional liability risk
Consultant Coordination
You are responsible for documents you did not produce
How Helonic Helps
Pre-Issue QA/QC
Review documents at DD, CD, and IFC milestones to catch coordination issues before contractors do.
Code Compliance Verification
Check your designs against IBC, ADA, fire codes, and egress requirements automatically.
Consultant Coordination Check
Verify that structural, MEP, and civil documents align with your architectural intent.
Schedule vs Plan Consistency
Ensure door schedules, window schedules, and finish schedules match what is shown on floor plans.
Dimension Verification
Catch dimension strings that do not add up before they become field problems.
Common Issues We Catch for Architects
Coordination Issues
- Door schedule vs floor plan conflicts
- Ceiling heights vs MEP clearances
- Structural vs architectural dimension mismatches
- Missing or conflicting keynotes
Code Compliance
- ADA accessibility requirements
- Fire rating continuity
- Egress width and travel distance
- Occupancy load calculations
Benefits for Architecture Firms
Related Resources
Improve Your QA/QC Process
See how Helonic helps architecture firms catch issues before they leave the office.
Schedule a Demo