Revision Comparison

Track Changes Between Drawing Sets

Compare drawing revisions to identify what changed between versions. Catch unclouded modifications and understand the scope of revisions quickly.

Why Revision Tracking Matters

65%
of changes go unclouded between revisions
PlanGrid
$50K+
average cost of missed revision changes
Industry
15-20
revisions average before construction
AGC
25%
of RFIs caused by revision tracking failures
FMI

How It Works

  1. 1

    Upload Both Versions

    Upload your previous drawing set and the new revision. Match sheets automatically by sheet number.

  2. 2

    AI Comparison

    Our AI compares each sheet pair, identifying visual and textual differences.

  3. 3

    Change Classification

    Changes are classified by type: dimensional, material, layout, notes, and more.

  4. 4

    Difference Report

    Get a sheet-by-sheet breakdown of what changed, including unclouded modifications.

Types of Changes Detected

Clouded Changes

  • Revision clouds and deltas
  • Updated revision blocks
  • New or modified details
  • Changed dimensions within clouds

Unclouded Changes

  • Modified dimensions without clouds
  • Changed notes or keynotes
  • Moved or deleted elements
  • Material or finish changes

Layout Changes

  • Wall relocations
  • Door or window moves
  • Equipment repositioning
  • Room configuration changes

Administrative Changes

  • New sheets added
  • Sheets removed or superseded
  • Title block updates
  • Sheet renumbering

The Unclouded Change Problem

Design teams are supposed to cloud all changes between revisions. In reality, changes slip through unclouded. A dimension changes, a note gets modified, a door swings the other way, but there is no cloud to flag it.

This is dangerous. Contractors price based on one set, then build from another. If they miss an unclouded change, it becomes a field problem, a claim, or at minimum, a heated conversation about who should have caught it.

Helonic catches what humans miss. Our AI compares every element on every sheet, identifying changes whether they are clouded or not. You know exactly what changed between versions.

Use Cases

  • Bid to Award Comparison

    Compare the bid set against the contract set to identify scope changes before signing.

  • Milestone Reviews

    Track changes between 50%, 90%, and IFC sets to understand design evolution.

  • ASI/Bulletin Review

    See exactly what an ASI changes without manually flipping between versions.

  • Subcontractor Updates

    Show subs exactly what changed in the latest revision that affects their scope.

Related

Never Miss an Unclouded Change

See how Helonic compares drawing revisions and catches what manual review misses.

Schedule a Demo