Autodesk Construction Cloud

Direct Platform Integration

Sync projects and drawings directly from Autodesk Construction Cloud. Connect your ACC account to Helonic for seamless project access, automatic drawing updates, and issue tracking — no manual file uploads, no version confusion, no wasted time downloading and re-uploading PDFs.

Integration at a Glance

Direct
ACC sync — no manual file downloads needed
Zero
manual upload — drawings pulled automatically
Real-time
project access to your ACC folder structure
Auto
drawing updates trigger re-analysis

How It Works

  1. 1

    Connect Your Account

    Authorize Helonic to access your Autodesk Construction Cloud account through a secure OAuth connection. Your credentials are never stored — we use token-based access.

  2. 2

    Select Projects

    Browse your ACC projects and folders directly within Helonic. Select the project and drawing folders you want to analyze — the folder structure mirrors your ACC setup.

  3. 3

    Automatic Sync

    Drawings are pulled from ACC automatically. When new versions are uploaded to ACC, Helonic detects the change and queues the updated drawings for re-analysis.

  4. 4

    Push Results Back

    Analysis findings can be pushed back to ACC as issues, creating a closed-loop workflow where your team reviews and resolves issues without leaving the ACC platform.

Key Capabilities

Project Folder Sync

Browse and select from your complete ACC project and folder hierarchy. Helonic mirrors your folder structure so you always know exactly which drawings are being analyzed.

Drawing Version Tracking

Every drawing version synced from ACC is tracked. When a new revision is published, Helonic maintains the version history and can compare analysis results between revisions.

Issue Push to ACC

Analysis findings can be exported as ACC issues with location pins, descriptions, assignees, and priority levels — integrating directly into your team's existing issue workflow.

Team Member Mapping

Maps your ACC team members to Helonic users, ensuring that issue assignments and notifications reach the right people on both platforms without duplicate accounts.

Automatic Re-Analysis on New Uploads

When new drawing versions are published to your connected ACC folders, Helonic automatically detects the update, pulls the new files, and runs a fresh analysis — no manual intervention required.

Selective Folder Sync

Choose exactly which ACC folders to sync — whether that's the full project drawing set or just specific discipline folders. You control what gets analyzed and when.

Why This Matters

Construction teams already manage their drawings in Autodesk Construction Cloud. Asking them to download PDFs, re-upload to another platform, and manually track which version was analyzed creates friction that slows adoption and introduces version control risks. If the wrong version gets analyzed, the results are meaningless.

Direct ACC integration eliminates this friction entirely. Your drawings stay in ACC where your team already works. Helonic pulls them automatically, analyzes them, and pushes findings back as ACC issues. The result is a continuous quality checking loop that runs in the background without requiring anyone to change their workflow.

Related

Connect Your ACC Account

Set up the Autodesk Construction Cloud integration in minutes and start analyzing drawings directly from your ACC projects.