AI Drawing Review for Code Consultants
Screen drawings against multiple building codes, fire/life safety standards, and accessibility requirements automatically.
The Code Consultant's Challenge
Complex Multi-Code Compliance
Projects must comply with IBC, local amendments, NFPA, ADA/ICC A117.1, and energy codes simultaneously—each with overlapping and sometimes conflicting requirements
Evolving Standards
Code cycles update every three years, with local jurisdictions adopting different editions and amendments that change review criteria
High Volume Reviews
Each project requires systematic review across dozens of code sections, making it difficult to maintain thoroughness under tight deadlines
How Helonic Helps
Multi-Code Compliance Screening
Automatically screen drawings against IBC, NFPA, ADA, and energy code requirements in a single pass. Flag potential violations with specific code section references.
Fire and Life Safety Comprehensive Review
Verify fire-rated assemblies, egress widths and travel distances, area of rescue assistance locations, fire separation distances, and sprinkler coverage against NFPA 13 and IBC Chapter 9.
Accessibility Audit
Check accessible routes, door clearances, restroom layouts, signage, and parking against ADA Standards and ICC A117.1 to catch non-compliant conditions before permit submission.
Energy Code Pre-Check
Review envelope details, fenestration ratios, and mechanical system specifications against IECC or ASHRAE 90.1 requirements to flag energy code gaps early in design.
Occupancy Classification Verification
Confirm that occupancy classifications, construction types, and allowable areas are consistent throughout the drawing set and meet code requirements for the proposed use.
Common Issues We Catch for Code Consultants
Egress & Fire Safety
- Egress width deficiencies at corridors and stairwells
- Fire rating gaps in walls, floors, and shaft enclosures
- Dead-end corridor violations exceeding allowable length
- Missing or incorrect fire damper locations at rated assemblies
Accessibility & Energy
- ADA non-compliance in restrooms, routes, and parking
- Energy code violations in envelope and fenestration design
- Occupancy load calculation errors affecting egress design
- Incomplete code analysis on cover sheets
ROI for Code Consultants
Faster initial code compliance screening per project
Code section coverage across IBC, NFPA, and ADA
Review quality maintained across your entire team
Related Resources
Scale Your Code Reviews Without Sacrificing Quality
See how Helonic helps code consultants screen drawings faster while maintaining thorough, consistent compliance analysis.